← Back to catalog
NVIDIADatacenterLiquid cooling required
NVIDIA GB300 NVL72
Blackwell Ultra. The most powerful rack NVIDIA has ever shipped.
$6,250,000
72x Blackwell Ultra (NVL72 domain)
GPUs
~20TB HBM3e total
GPU Memory
~140 kW per rack
Power Draw
Blackwell Ultra Superchips with 279GB of per GPU and expanded switch bandwidth. Built for the largest reasoning and agentic-inference fleets, still liquid-cooled at the rack level.
Full Specifications
Compute
- GPUs
- 72x Blackwell Ultra (NVL72 domain)
- CPUs
- 36x Grace (Arm, 72-core)
Memory
- GPU Memory
- ~20TB total
Interconnect & Networking
- Bandwidth
- 130 TB/s aggregate
Power & Cooling
- Cooling
- Direct-to-chip liquid, required
- Power Draw
- ~140 kW per rack
Compatible & Required
Required — won't function without
Pairs well with
Add software & support
5-Year Mission-Critical Support (4-hour onsite)
$28,000